* – All polyurethanes used are 100% solids
Solid Color Epoxy (Color Charts)2 day process – one coat of water based, two part epoxy primer and one coat of pigmented polyurethane* with UV stabilizers.Note: The checker board floor is the same process as the solid color epoxy but requires a lot more time due to the necessary attention to detail.
| |
Light/Medium Chip (Color Charts) 2 day process – one coat epoxy primer, one coat pigmented polyurethane*, light or medium broadcast of chips into the polyurethane*. Light/Medium chip w/ clear coat - 3 day process – one coat epoxy primer, one coat pigmented polyurethane*, light or medium broadcast of chips into the polyurethane*, and a coat of clear polyurethane* with UV stabilizers over the chips. | |
Granite Full Chip Broadcast (Color Charts)3 day process – one coat of epoxy primer, one coat acrylic urethane, a full broadcast of chips, one coat of polyurethane* water based, one coat of clear polyurethane* with UV stabilizers.D-Size Chip Same Process completed with smaller chip size. | |
Acid Stain (2 day split process) This is a two day process. On the first day, the floor is lightly prepped and the acid is sprayed onto the floor. Once the desired color is achieved the acid is neutralized with ammonia. On day two the floor will be coated with a clear polyurethane* or solvent sealer. | |
Faux Flagstone Concrete is acid etched and thin sets are trowelled onto the existing concrete. Then a stone design is sketched over the dry thin set and grout lines are cut out using a grinder. Each stone is individually colored by hand, according to the chosen color scheme. After all the stones have been colored a polyurethane* or solvent sealer is applied. Once the sealer has dried the grout lines are colored. | |
Acrylic Cool Decking Concrete is acid etched and an acrylic thin set is laid. Then, a hopper is used to shoot the texture. When the texture is complete and dry the cool decking is then colored with the color selected. |